General information only, not site-specific engineering or legal advice.
Confirm the approval position
Missing paperwork does not necessarily mean work was never approved. Ask council about its records and the current requirements for your property. Existing work may need a retrospective application, with the appropriate pathway confirmed by council or a registered building surveyor.
Keep the roles distinct
Council determines the approval application. A building surveyor provides the relevant building-compliance documentation, while an engineer supplies the agreed structural input. An engineering report or certificate does not grant approval, resolve planning requirements or guarantee acceptance.
Prepare a concise enquiry
Share a brief description, available plans and the council or surveyor's request. AHD can confirm a structural scope and its deliverables. Geotechnical, surveying and drafting services remain third-party inputs, coordinated only where agreed.
This is general information, not a determination of approval status. Applicable standards and their current adopted editions are confirmed for the project; a general reference does not establish compliance.